Buildings and Equipment

 

Built structures change the existing landform through the terracing of working and parking areas, excavation for the water storage dam and the creation of perimeter earth bunds. Views of the operations area are restricted due to the existing vegetation and natural topography of the landscape. 

The mine design includes a series of earth bunds to screen ground level infrastructure and vehicle movements. The earth bunds are covered with topsoil and planted on the outer batter faces to provide a visual softening and to integrate within the surrounding natural landscape.

Dominant forms (positioning indicated on site plan).

1. Administration Office and Workshop

2. Integrated Mullock Landform

3. Run of Mine Silo (ROM)

4. Landscape Bunds

5. Carpark batter

6. Water Treatment Plant

7. Mine Water Dam

8. Vehicle Bridge

9. Concrete Batching Plant

10. Topsoil mound

Bird-In-Hand-Gold-Mine-Site-Map-Buildings.jpg

Minimal buildings and equipment will be located on the site

Example Images Gallery

 
Bird-In-Hand-Goldmine-Buildings-And-Equipment-1.JPG
Bird-In-Hand-Goldmine-Buildings-And-Equipment-2.JPG
Bird-In-Hand-Goldmine-Buildings-And-Equipment-4.JPG